This project consists of interior building modifications to expand the department by approximately 302 SF to the West and build out two (2) additional offices.
SMALL WORKS PROJECTS
As of 2013, Clark County is using the Municipal Research and Services Center of Washington (MRSC) Rosters to maintain its small works roster for non-federally funded public work projects under $350,000. To meet the eligibility requirements for Clark County small work projects contractors must submit their application (at no cost) to www.mrscrosters.org and select Clark County in your application.
You must be registered on the MRSC Roster to receive the Small Works Quote documents.
Closing Date: Wednesday, June 5, 2024
A meeting has been scheduled.
The project consists of installing property boundary fencing around the future Curtin Creek Community Park.
Addendum 1 - Issued Thursday, May 2, 2024
Closing Date: Wednesday, May 8, 2024
A meeting has been scheduled.
The project will consist of the installation of 3M™ Scotchshield™ Safety and Security Window Film Ultra S800 or equivalent on the interior surface of the exterior windows.
Closing Date: Wednesday, April 3, 2024
A meeting has been scheduled
The project consists of the removal and disposal of a 750-gallon abandoned septic tank and the decommissioning/removal of a 106-foot Drilled Well.
Addendum 1: Issued Wednesday, March 20, 2024
Addendum 2: Issued Thursday, March 28, 2024
Closing Date: Wednesday, April 3, 2024
A meeting has been scheduled.
There is failing insulation and soundboard at the facility that needs to be removed and replaced, with an estimated surface area of 16,707.18 sq ft.
Addenda 1: Issued Tuesday, March 19, 2024
Closing Date: Wednesday, March 27, 2024
A meeting has been scheduled.
The roof of the Clark County Corrections Center has approximately 3,400 SF of integrated solar panels that have had the sealant and taping fail. The job would consist of removing the old mastic and taping and re-adhering to the main roof with an approved sealant.
Closing Date: Wednesday, April 10, 2024
A site meeting has been scheduled.
This project consists of regrading a portion of the property to the east of an existing stall barn and paving the existing access driveway, for proper drainage and easier site access.
Closing Date: Wednesday, March 27, 2024
A meeting has been scheduled.
The existing old wood structured lean-to is rotting out and shall be removed and replaced with a new steel structed lean-to.
Closing Date: Wednesday, March 6, 2024
A meeting has been scheduled.
The project is for South Hall 3 and is essentially two (2) roofs that share a gutter in the center of both buildings, both roofs will be replaced. The West roof is approximately 180’ x 42’ each side, while the East roof is approximately 180’ x 60’ each side. Install new corrugated roofing with vapor barrier.
Closing Date: Wednesday, February 14, 2024
A site meeting has been scheduled.
The project consists of the demolition and removal of the single-family dwelling with a detached garage from a Clark County owned property.
Addendum 1 Issued: Friday, February 9, 2024
Closing Date: Wednesday, February 14, 2024
A meeting has been scheduled